000 | 00673 a2200277 4500 | ||
---|---|---|---|
001 | 43074 | ||
020 | _a31 | ||
041 | _aeng | ||
080 | _a69.003.1 Cha(4) | ||
245 | _aEstimating, costing and specification in civil engineering : principle and application : M.K.S. system | ||
250 | _a9th rev.& enlg. ed | ||
260 | _aCalcutta | ||
260 | _bM. Chakraborti, | ||
260 | _c1987 | ||
300 | _aviii,808 p. | ||
300 | _c24 cm | ||
490 | _a | ||
100 | _aChakraborti, M. | ||
700 | _a | ||
650 | _a | ||
650 | _aBuilding-Estimates | ||
650 | _aValue analysis (cost-Control) | ||
650 | _aBuilding-Contract and specifications | ||
942 | _cBK | ||
942 | _2UDC | ||
999 |
_c39467 _d39467 |