Your search returned 5 results.

Sort
Results
Scheduling of man electroplating shop with a view to meet the requirements of assembly (R)

by Josy, J.C | Somasundaram, S. and Subash Babu, A.

Series: Edition: Language: English Publication details: Bombay ; IIT ; 1985Availability: Items available for reference: Not for loan (1) Call number: 043:65.012.2/.2:621.357.7Jos.

Computerized scheduling system for a multi-product industry (R)

by Venugopal, N | Somasundaram, S. and Subash Babu, A.

Series: Edition: Language: English Publication details: Bombay ; IIT ; 1986Availability: Items available for reference: Not for loan (1) Call number: 043:658.513Ven.

Performance index measurement for switchboard assembly operations (R)

by Vishwakarma, H.R | Somasundaram, S. and Subash Babu, A.

Series: Edition: Language: English Publication details: Bombay ; IIT ; 1986Availability: Items available for reference: Not for loan (1) Call number: 043:65.015.2:621.316.5Vis.

Development of production control information system on a personal computer (R)

by Mahesh, R | Somasundaram, S. and Subash babu, A.

Series: Edition: Language: English Publication details: Bombay ; IIT ; 1986Availability: Items available for reference: Not for loan (1) Call number: 043:658.5:681.3-181.4Mah.

Production control system for a machine shop to meet requirements of assembly (R)

by Bhatnagar, P.K | Somasundaram, S. and Subash babu, A.

Series: Edition: Language: English Publication details: Bombay ; IIT ; 1986Availability: Items available for reference: Not for loan (1) Call number: 043:621.7.681.3Bha.

Pages

Powered by Koha